From the first call to signing the acceptance certificate — everything is under control.
Project Documentation Review Before Works Begin Our engineers study the design documentation before the contractor arrives on site. We identify design errors, incorrect estimates and contradictions in the documents — before they become costly problems on the construction site.
Daily On-Site Control A certified engineer is present at your construction site every day. He monitors the quality of construction and installation works, verifies compliance of works with the project, records volumes, and signs concealed works certificates only after actual inspection.
Estimate and Completed Works Volume Verification Before signing each KS-2/KS-3 certificate, our specialist verifies the actual volumes. Overstatements are returned — on average the savings amount to 20 to 30% of the certificate value.
Weekly Reports Delivered Directly to You Every week you receive a structured report: what has been inspected, what violations were found, what has been resolved, what is planned. You always have a clear picture of what is happening on site — even when you are in another city.
Project Acceptance and Commissioning Final inspection before signing the acceptance certificate. Full verification of completed works compliance with the project and regulations. Conclusion on the quality of construction and installation works for the regulatory authorities of the Republic of Kazakhstan.